Bus lane, Roermond

Client: Den Ouden Contracting Firm (Municipality of Roermond)

Period of construction: 2014

Check the video here.

In 2014, the eastern part of the ring road in Roermond was reconstructed. A single bus lane was constructed over a length of 900 metres (approximately 3,000 m²). The concrete surface was made of a single layer of plain concrete with a width of 3.20 metres. The concrete was finished with a texture.

The greatest challenge of this project was the phased construction of the concrete road throughout the project area. Regular traffic had to be able to use the road during the whole construction period.