Accessing structure core conversion - Loon op Zand

Client:                              municipality of Loon op Zand
Implementation period:  2015-2017

The work is located in Loon op Zand and stretches across a length of approximately 2,600 metres. The objective is to improve the accessibility of the core of Loon op Zand, create a better and safer traffic flow, and give the public space a quality impulse. The core of Loon op Zand is not sustainable and future-proof. The maximum speed has been dropped from 50 km/h to 30 km/h. Through adjustments of the roads, paving stones, and green, the appearance of the street is also improved. The core of Loon op Zand is cleaner and safer because there is less traffic and people drive slower.